Mobile Jaw
Crusher Plant
Wide Material Coverage
Tire-type mobile primary crushing station built on PE & C series jaw crushers. From granite and basalt to limestone, mining ore, and recycled concrete — set up in under 4 hours, relocate without a crane.
One Primary Unit for a Wide Range of Materials
The SNE series integrates vibrating feeder, jaw crusher mainframe, and discharge conveyor into a single road-towable trailer — ready for quarry stone, mining ore, river pebble, limestone, or recycled concrete feed without foundation work or crane installation.
Designed for Versatility, Built for Daily Production
Deep Crushing Chamber
Optimized jaw angle and stroke help maintain stable throughput across hard rock, soft stone, mining ore, and mixed quarry feed.
ZSW Grizzly Feeder
Pre-screens fines before they reach the jaw, reducing unnecessary wear on jaw plates and protecting throughput.
Siemens PLC Control
One-touch auto-start with feeder→crusher→conveyor interlock sequence. Remote monitoring available.
Road-Towable Chassis
Ships fully assembled. Relocate between sites with a standard tractor — no disassembly, no crane required.
Mn18Cr2 Jaw Plates
High-manganese cast steel jaw plates standard. Mn22 available for highly abrasive ores. Flip plates at 50% wear to equalize consumption.
SNE Series in the Field
SNE Series — Standard Models
Listed capacities use granite as a reference condition. Softer stone or recycled feed may run higher, while actual production still depends on hardness, moisture, and feed gradation.
A Flexible First Stage for Different Project Types
300 TPH Granite Line — Philippines
The client operates a granite quarry with four separate working faces — each active 2–3 months before the excavation front advances. A fixed plant would have required four concrete foundations.
Solution: SNE750 mobile jaw unit (primary, feed up to 630 mm, 130–330 t/h at 75–150 mm discharge) feeding into a secondary cone stage. The jaw unit moved between faces three times during the project — each relocation completed in under 6 hours.
→ Full configuration details in Global Project Cases
What Site Managers Ask Before Ordering
Where Does Your Product Go Next?
Jaw crushing is typically the first stage. Based on your target output, choose the next step in your production line.
Ready to Talk Specs? Share Your Site Details.
Material type, required daily output, site conditions — get a written configuration within 24 hours.